Do I Need a Permit?
 
building.jpgPermits are required for all new construction. A permit is not required for some repairs; however repairs such as cutting away part of any wall, partition or portion thereof, the removal or change of any required means of egress, recovering any wall or roof system will require a permit. A general rule of thumb is a permit is required for most alterations except routine maintenance. If you are unsure as to whether your project requires a permit, call the Village Office. It generally takes 7-10 days to obtain a building permit.
 
How to Apply for a Permit
 
Come to the Village Office for a building permit application. Or download one from this site.  If the Homeowner is doing the work, the Homeowner completes the application, if a Contractor is doing the work, the Contractor completes the application and pulls the permit. Two sets of building plans showing all the dimensions and also two site plans, showing where the septic, well, setbacks and all accessory buildings are located, are needed along with a site plan review fee. The documents will then be reviewed by the Oakland County Health Department (if applicable) and the Village Building Inspector to ensure compliance with Village codes.
 
Building Department Tidbits
  • All inspectors work part time and require a minium of twenty four (24) hour notice for all inspections proir to their scheduled days.
  • Oakland County Health Department's approval is required for most building permits
  • A site plan in generally a survey
  • Building bonds are refunded twice a month (middle or end of the month)

  

 